When a product is manufactured in-house, the finished goods must be moved from the shop floor to the warehouse. To achieve this, a Goods Receipt (GR) must be performed for the production order. Once the GR is posted, the stock will be linked to an inspection lot that is automatically created. For this process, the 04 inspection type (GR inspection for production order) must be activated in the Quality Management (QM) view of the material master.
Process flow:
Setup required : Activation of 04 inspection type in the material master QM view
1. Create a production order using tcode CO01
2. Once the production order is created, perform GR for the order.
3. Once the GR is performed, material document will be posted and inspection lot will be created and the stock will move to QI
4. Inspect the lot and based on the UD, the stock will move from QI
No comments:
Post a Comment