There are two types of inspection process in production:
- In-process inspection : When the product is being manufactured but the manufacturing process is not completed, then in process inspection is performed. For that 03 inspection type has to be activated in the material master.
- Inspection at the end of production : Before releasing the product to the market, inspection takes place in order to check if the quality standards are met.
QM setup required
Material master with inspection type 03 activated
MIC to measure the characteristics of bottle size
Sampling procedure to calculate sample and decide whether the sample passes or fails the inspection
PP setup required
Material master with required MRP setup
BOM
Work center
Routing
Production Version
Process order creation and release to create an inspection lot
Material master setup:
Inspection type 03 is activated which is in-process inspection for production order. Here post to inspection stock field is missing as the inspection takes place when the production is in process and hence no stock will be associated.
MIC:
Production version:
Routing :
Here the requirement is to inspect the bottle after cooling process. Hence the MIC and sampling procedure will be assigned to this operation i.e. 0030.
Here the requirement is to inspect the bottle after cooling process. Hence the MIC and sampling procedure will be assigned to this operation i.e. 0030.
In the UD screen, there is no provision to perform stock posting as there is no stock associated